Seismic Bracing System

You Are Here:Home-Case- Seismic Bracing System
Western Maintenance Base

Western Maintenance Base

Xi’an Railway Administration Xi’an EMU Depot Xicheng EMU maintenance library was built and put into trial operation, which made the Xi’an Railway Administration’s EMU maintenance capacity reached 10 lines and 20 trains, and the total number of storage lines reached 48, becoming the largest The EMU maintenance base with the most advanced functions, construction standards and the highest degree of modernization provides sufficient maintenance guarantee for the construction of the western high-speed rail hub.

Western Maintenance Base 2